[Dec-2025] SAP Certified Specialist E-S4CON-2505 Exam Practice Dumps [Q12-Q30]

Share

[Dec-2025] SAP Certified Specialist E-S4CON-2505 Exam Practice Dumps

2025 E-S4CON-2505 Premium Files Test pdf - Free Dumps Collection

NEW QUESTION # 12
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU IMPORT ALL
  • B. EU CLONE MIG_DT_RUN
  • C. EU_CLONE MIG_DT_CREATTE
  • D. EU_CLONE MIG SOT RUN

Answer: B


NEW QUESTION # 13
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path was stored in file sumabap.conf during registration.
  • B. The path was stored to the environment of user <sid>adm during registration.
  • C. The path is taken from the URL entered in the browser to start SUM.
  • D. The path was stored in file host profile during registration.

Answer: A


NEW QUESTION # 14
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. During conversion, SUM delivers some business functions already activated.
  • B. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. Activate the required business functions manually in the production system.

Answer: A,C


NEW QUESTION # 15
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. Stack XML file calculated by the maintenance planner
  • C. Parameter file SAPup_add.par
  • D. MIGRATE_DT_DUR.XML file from a previous run

Answer: B,D


NEW QUESTION # 16
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.

  • A. Create new versions of the objects you need to adjust.
  • B. Assign the transport request as a modification adjustment transport.
  • C. Release the transport request containing the modification adjustment.
  • D. Manually activate the adjusted dictionary objects.

Answer: A,B


NEW QUESTION # 17
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?

  • A. Software Orchestrator
  • B. RISE with SAP system transition workbench
  • C. SAP migration cockpit
  • D. SAP Business Transformation Center

Answer: B


NEW QUESTION # 18
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: B,C,D


NEW QUESTION # 19
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?

  • A. The start of the Execution roadmap step
  • B. The end of the database migration
  • C. The end of the business downtime
  • D. The start of the business downtime

Answer: C


NEW QUESTION # 20
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Use DMO for SUM.
  • C. Upgrade the SAP system.
  • D. Perform an SAP S/4HANA conversion without DMO.
  • E. Apply SAP Support Packages.

Answer: B,C,E


NEW QUESTION # 21
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • D. Creation of application tables in the SAP HANA database in phase
  • E. Import of upgrade and language data from the download directory in phase TAABIM UPG

Answer: A,B,E


NEW QUESTION # 22
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • B. SUM is still running in uptime; the 40 defined R3load processes are considered.
  • C. Without table contents comparison, only 40 R3load processes are being started.
  • D. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.

Answer: A


NEW QUESTION # 23
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Delete client 066 (Early-Watch client).
  • B. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
  • C. Perform the custom code adjustment.
  • D. Install add-on SAP Gateway 7.50.

Answer: A,B


NEW QUESTION # 24
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. SAP Solution Manager 7.2
  • C. SAP S/4HANA Server 2022
  • D. Standalone AS ABAP with SAP BASIS 752

Answer: C,D


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?

  • A. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • D. The SAP Support Packages that will be bound to the conversion

Answer: C


NEW QUESTION # 26
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Unicode conversion
  • B. Custom code analysis
  • C. Software update
  • D. Database migration

Answer: C,D


NEW QUESTION # 27
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the main import
  • C. To optimize the conversion
  • D. To optimize the migration

Answer: D


NEW QUESTION # 28
......

Get ready to pass the E-S4CON-2505 Exam right now using our SAP Certified Specialist Exam Package: https://vcepractice.pass4guide.com/E-S4CON-2505-dumps-questions.html